<?xml version="1.0" encoding="utf-8"?><rss version="2.0"><channel><title>Advisories/Updates</title><link>http://www.wsdot.wa.gov:80/Projects/Viaduct/Status</link><description>Advisories/Updates</description><item><title>Constrution Highlights for Friday, May 24 – Friday, May 31</title><link>http://www.wsdot.wa.gov:80/Projects/Viaduct/Contents/Item/Display/457</link><description>&lt;h2&gt;
	&lt;strong&gt;SR 99 corridor&lt;/strong&gt;&lt;/h2&gt;
&lt;p&gt;
	&lt;strong&gt;Until mid-2015&lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
	&lt;li&gt;
		SR 99 is reduced to two lanes in each direction between Valley and Harrison streets.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;
	&amp;nbsp;&lt;/p&gt;
&lt;h2&gt;
	&lt;strong&gt;North&lt;/strong&gt;&lt;/h2&gt;
&lt;p&gt;
	&lt;strong&gt;Until mid-2015&lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
	&lt;li&gt;
		Mercer Street is reduced to two eastbound lanes between Fourth Avenue North and Ninth Avenue North.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;
	&amp;nbsp;&lt;/p&gt;
&lt;p&gt;
	&lt;strong&gt;Friday, May 31&lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
	&lt;li&gt;
		Crews will close Taylor Avenue North between Denny Way and John Street from 7 a.m. to 6 p.m.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;
	&amp;nbsp;&lt;/p&gt;
&lt;h2&gt;
	&lt;strong&gt;Central &lt;/strong&gt;&lt;/h2&gt;
&lt;p&gt;
	&lt;strong&gt;Through summer 2013&lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
	&lt;li&gt;
		South Jackson Street is reduced to one lane in each direction around the clock between First Avenue South and Second Avenue South Extension.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;
	&amp;nbsp;&lt;/p&gt;
&lt;p&gt;
	&lt;strong&gt;Saturday, June 1 &amp;ndash; Wednesday, June 19&lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
	&lt;li&gt;
		Crews will reduce South Jackson Street to one lane in each direction around the clock through the Sixth Avenue South intersection. Drivers and bicyclists will not be able to make left turns at the intersection.&lt;/li&gt;
&lt;/ul&gt;
</description><pubDate>Fri, 24 May 2013 17:02:07 GMT</pubDate><guid isPermaLink="true">http://www.wsdot.wa.gov:80/Projects/Viaduct/Contents/Item/Display/457</guid></item><item><title>Watch us make history</title><link>http://www.wsdot.wa.gov:80/Projects/Viaduct/Contents/Item/Display/341</link><description>&lt;p&gt;
	&lt;span style="font-size: 12px"&gt;If you haven&amp;rsquo;t seen the SR 99 tunnel&amp;#39;s south-end work zone lately, you should. The progress our crews are making to the west of Seattle&amp;rsquo;s stadiums is jaw-dropping, and it&amp;rsquo;s worth&amp;nbsp;taking a look.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;
	&lt;span style="font-size: 12px"&gt;If you want to experience tunnel construction in person, the best viewing area is on the bicycle/pedestrian path to the west of the construction zone, between South King and South Atlantic streets. We&amp;rsquo;ve posted a series of informational signs on the fence along the path to help visitors understand what crews are up to. &lt;a href="http://wsdot.wa.gov/projects/viaduct/Media/Default/Documents/2012_Self_Guided_WalkingTour.pdf"&gt;This map&lt;/a&gt; shows you how to get there.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;
	&lt;span style="font-size: 12px"&gt;Of course you don&amp;rsquo;t even have to leave your chair to see tunnel crews in action. Our &lt;a href="http://wsdot.wa.gov/projects/viaduct/Traffic/ConstructionCam"&gt;construction cameras&lt;/a&gt; give you the latest view of what&amp;rsquo;s happening in the north- and south-end work zones.&lt;/span&gt;&lt;/p&gt;
</description><pubDate>Tue, 16 Oct 2012 18:00:48 GMT</pubDate><guid isPermaLink="true">http://www.wsdot.wa.gov:80/Projects/Viaduct/Contents/Item/Display/341</guid></item></channel></rss>