Note for iPhone/iPad users: Download the OxBlue app. Select "open link" and type alaskanwayviaductreplacement (no spaces).
Simulations
Keeping waterfront traffic moving during SR 99 tunnel construction (2012) - Simulation shows changes in access to the Seattle ferry terminal during SR 99 tunnel construction. View on YouTube or download WMV file . SR 99 tunnel south portal and South Holgate to South King Street construction (2012) - Interactive simulation describes how the tunnel's south portal and the south end viaduct replacement will be constructed. SR 99 tunnel north portal and Mercer Corridor construction (2011) - Interactive simulation describes how the tunnel's north portal and the City's two-way Mercer Street project will be constructed.
SR 99 construction bypass drive-through (2011) shows how SR 99 operates after October 2011, when the viaduct's south end was demolished. View on YouTube . Tunnel drive-through video (2010) shows an early design concept for the SR 99 tunnel and the access provided at its north and south portals. View on YouTube or download WMV file . Tunnel underground video (2010) shows the SR 99 tunnel’s route beneath downtown Seattle and its proximity to other underground structures. View on YouTube or download WMV file .
Simulated collapse of Alaskan Way seawall and viaduct (2009) shows what could happen to both structures if a strong earthquake were to shake the Puget Sound region. View on YouTube or download WMV file . Tunnel boring machine animation (2009) explains how a bored tunnel is constructed. View on YouTube or download WMV file.
Construction videos
SR 99 Tunnel Project videos:
December 2012 SR 99 tunnel boring machine ceremony in Osaka, Japan (view on YouTube)