Skip Top Navigation

Budget Information

  • Sorry. We are unable to display the budget information at this time.

US 395 - North Spokane Corridor - Freya Structures

Status

April 2017


Two mainline freeway bridges will be built over Freya Street north of Francis Ave. 

Why is WSDOT building these bridges?
These two bridges will carry the main freeway lanes of the North Spokane Corridor across Freya Street to connect the existing freeway lanes to the section through the Hillyard industrial area.

The End Result
A 10-mile,multi-lane, high-speed transportation route providing an efficient through route in the Spokane metro area.

Project Benefits

When fully completed, travel time between Wandermere and I-90 will be shortened to approximately 12 minutes; fewer trucks will be on the local arterials, because they will be using the freeway for north and south destinations points.

Provides a safe bicycle/pedestrian trail that connects to the Centennial Trail and other established trail systems, as well as neighborhoods within the Spokane area.

What is the project timeline?
The project will get underway in spring 2017 and take about 18 months to construct.

Financial Information

Project signage will reflect the cost of construction engineering, project bid award and sales tax.

How can I get more information?
Contact:
Mark Allen, Project Engineer

WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA 99207
509-324-6000
allenmv@wsdot.wa.gov

back to top