US 395 - US 195 Bridge Expansion Joint Replacement

Status

March 2017

  • In Design

Replace failing expansion joints on the US 395/Little Spokane River bridge and the US 195/Pine Creek and BNSF bridges.

Why is WSDOT replacing these expansion joints?
Years of normal wear and tear has damaged some of the expansion joints on these bridges.

The End Result
A smoother highway with properly functioning expansion joints.

Project Benefits
Extend the useful life of the bridges and protect the public investment in the infrastructure.

What is the project timeline?
Design will be completed and the project will be advertised for construction bids and built in the 2017 season.

Financial Information

Project signage will reflect the cost of construction engineering, project bid award and sales tax.

How can I get more information?