US 395 - Arden to Colville - Paving

Status

October 2017

  • Weekly Construction Update
  • Under construction.
  • Awarded the Central Washington Asphalt of Moses Lake, WA with a construction bid of $3,491,873.

Us 395 will be resurfaced with hot mix asphalt.  ADA sidewalk work is included.

Why is WSDOT resurfacing this highway?
High traffic volumes with normal wear and tear has deteriorated the pavement surface.

The End Result
A smoother roadway and protection for the underlying highway structure.

Project Benefits
A better experience for drivers with a reduced need for repairs and patching.

What is the project timeline?
The project will be designed, advertised for bids and constructed during 2017.

Financial Information

Financial Data for PIN 639522T
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $3,876
CWA $0
Total $3,876

Project signage will reflect the cost of construction engineering, project bid award and sales tax.

How can I get more information?
Contact:
Mark Allen, Project Engineer
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA 99207
509-324-6000