US 395 - NSC - US 2 to Wandermere & US 2 Lowering

Quarterly Project Report Update for Quarter Ending September 2005

Project Title & Location

NSC-US 2 to Wandermere & US 2 Lowering - Construct New Roadway

Project Description
Constructs four new drivable lanes of the North Spokane Corridor between Farwell Road and Wandermere including a new connection to US 395 at Wandermere. Constructs an interchange at US 2. This project will increase capacity and reduce travel time. There will be four lanes when this project is completed.

Contractor/Consultant
Project not yet advertised or awarded

Recent Progress

This project will have two contracts.  The first contract, US 2 Lowering, the PS&E is approximately 15% percent complete.  Ongoing work in the Project Office includes resubmitting bridge site data, investigating alternative bridge designs, continuing hydraulic design, finalizing the US 2 interchange plans for approval, investigating intersection options for the US 2/Farwell intersection, designing frontage roads, and preparing preliminary contract plan sheets.

Design Construction Impacts

As noted in the March 2005 and June 2005 Gray Notebooks, costs for both Nickel funded projects on the North Spokane Corridor could increase at completion in 2011, due to higher than anticipated costs in Right of Way acquisition and construction materials.  The region is investigating project design changes to reduce costs and develop alternative funding proposals to address this cost increase.

Environmental Impacts / Compliance

No impacts at this time.

Impacts to Traffic
No impacts at this time.

Project Milestones Scheduled Attained Milestone Outlook
Start of Project April 2004 April 2004
Right of Way June 2005  July 2005 No impacts at this time
Environmental Permits August 2003 August 2003 No impacts at this time
Contract Advertisement August 2008    
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering 7.4 9.2
Right-of-Way 2.6 3.2
Construction 71.0 87.6
Funded Project Costs 81.0 100.0

Nickel funds included in above costs

80.65 99.5

2005 Transportation Partnership Account

  For more information, go to www.wsdot.wa.gov/projects

Mike Gribner, WSDOT Project Engineer @ (509) 324-6095 or E-mail: GribnM@wsdot.wa.gov