Project Title & Location
NSC-US 2 to Wandermere & US 2 Lowering - Construct New Roadway
|
Project Description
Constructs four new drivable lanes of the North Spokane Corridor between Farwell Road and Wandermere including a new connection to US 395 at Wandermere. Constructs an interchange at US 2. This project will increase capacity and reduce travel time. There will be four lanes when this project is completed.
|
|
Recent Progress
This project will have two contracts. The PS& E for the first, US 2 Lowering, is approximately 80% complete. The PS&E for the second, US 2 to Wandermere is approximately 30% complete. Ongoing work in the Project Office includes hydraulic design, finalizing Interchange plans for approval, continuing staging plan design, designing frontage roads, traffic analysis and preparing contract plan sheets. Bridge design for the US 2 Lowering is nearing completion, wall design is underway. US 2 to Wandermere bridge design is under way and wall site data is being developed.
|