NSC - Francis Avenue Improvements - Complete December 2014

Overview
WSDOT  replaced the existing, 160-foot long, Francis Avenue Bridge with a 455-foot long structure. In addition, signal system and configuration changes were made at  the Market Street and Freya Street intersection.

The existing bridge crossed over the BNSF Railway tracks. The new structure provides room for the same tracks and the future new freeway to pass under Francis Avenue.

How you benefit

Relieves congestion
Improved freight and passenger vehicle mobility with the addition of the multi-lane freeway facility.

Partnerships & cooperation
WSDOT worked closely with BNSF Railway on the design and construction of this project.

Funding

2003 Gas Tax (Nickel Funding): $11,068,000
Pre-Existing Funds (PEF): $18,970,000
Total: $30,038,000

 

Contact us
Al Gilson, Communications
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA  99207
509-324-6015
GilsonA@wsdot.wa.gov