Skip Top Navigation

Project map

Project locator map
The bridge crosses the Columbia River between Stevens and Ferry Counties.  During the 15 to 20 nights of full closures, traffic will need to detour around the bridge via SR 25 and the Northport/Flat Creek Road-a 68 mile route.  All loads over 8 1/2 feet are required to use the detour or other alternate routes 24/7 during the entire construction period, July-October 2012.