Skip Top Navigation

US2/US97A West Wenatchee Paving and I/S Improvements Map

Map
This project includes paving where indicated by the orange lines and also a new roundabout on US 97A at Ohme Garden Road and the entrance into Stemilt Growers packing facility.
The project paves 1-1/2 miles of US 2 from MP 117.62 to 119.16, 1-3/4 miles of US 97A between MP 199.83 to 201.57 and builds the new roundabout at MP 200.32.