|
Project Title & Location
US 2/Wenatchee-Build Trail Connection-Wenatchee, MP 119.69B to 119.76
|
Project Description
This project will construct a new bridge adjacent to the railroad bridge on US 2/97 and extend the Apple Capitol Loop Trail to the west around the northbound off ramp to connect with US 97A/Euclid Avenue. This will provide a designated connection for bicyclists and pedestrians from the Loop Trail to the Port of Chelan County's Olds Station Industrial Park, the adjacent commercial district and shopping center and US 97A.
|