Skip Top Navigation Skip to Content
Two variable speed limit signs were installed on the west side of the summit. This special machine cut the trench for the new fiber cable directly through the existing pavement. After it was installed on the south shoulder of US 2, the fiber optic cable was buried.Crews burying the cable.Paving over the fiber cable trench