This diagram shows a cross section of the temporary soil nail wall that crews have built along US 2. Crews built a 130 foot long wall, inserted 40 foot long nails into the hillside, and installed a new drainage system. This will help ensure that the road does not continue to sink and that we can keep this critical route open and safe for drivers while we design the permanent fix.