US 2 - Sunset Falls Slope Stabilization - Photos

September 2008

Crews finished repairing and re-paving the roadway the first week of September.


Contractors worked around the clock to remove the 6.5 feet thick pavement.

August 2008
Finished buttress
The completed buttress will help stabilize the hillside, preventing further movement under the road.

Crews have completed the rock buttress
Crews completed building the rock buttress the week of August 21.

Crews place riprap to form the rock buttress.
After blasting a notch into the bedrock, crews place loose rocks and boulders to form the rock buttress.

The ground after blasting
The ground is slightly swelled after the blasting.

Crews drilled holes for blasting
Crews drilled holes to place the dynamite prior to blasting.


July 2008
Crews relocating utilities
Crews are relocating overhead utilities as they prepare to start excavation work.

Sunset Falls Project Area
Southeast end of the slope
The roadway embankment under US 2 near Sunset Falls is slowly sliding below the roadway surface. We will build a large rock and gravel wall to stabilize the embankment.

Looking west at the project area
This photo is looking west at the project area.