US 2 - Leavenworth to Cashmere - Paving - Complete August 2007

Project Status - Complete
Project Map View entire map. This US 2 paving project, from Milepost 100 to MP 110, is located in central Chelan County.

Photo of traffic at Deadman Hill and Sanders Rd intersection

View entire photo. A right turn lane for westbound traffic was constructed at the Deadman Hill/Saunders Rd. intersection at MP 105.
Click to enlarge

View entire photo 
One lane of traffic in each direction was maintained throughout the paving process.

Overview
This preservation project paved 8.5 miles of US 2/97 from Leavenworth to Cashmere.

How You Benefit
Cross GlyphImproves Safety
This project provides a smoother driving surface. Includes a new right turn lane for westbound traffic at Deadman Hill/Saunders Rd. and other safety improvements including new signs, delineators, recessed pavement markers and striping.
Dollar Sign Glyph Economic Incentive
The repaving project prevents further deterioration to the existing roadway at the least possible "life cycle" cost.

Partnerships & Cooperation
Central Washington Asphalt, inc. was the contractor on this project.

Funding
This project was funded through the following sources:

  • Pre-existing gas tax - $3.9 million
  • Total funding from all sources - $3.9 million

Contact Us
Mike Fleming, Project Engineer
WSDOT North Central Region
P.O. Box 98
Wenatchee, WA 98807
Phone: (509) 667-2870 or toll free (888) 461-8816