US 2 - West of Leavenworth - Paver - Complete July 2009

Complete July 23, 2009
Click to enlarge
View entire map
The orange line shows the nearly 10 mile section of US 2 from Leavenworth to the Tumwater Campground that was paved.

Click to Enlarge
View entire photo 
This is how the new pavement looked in July, 2009. (After)

Click to enlarge
View entire photo 
US 2 through Tumwater Canyon was paved in this project. (Before)

Status

Project Complete July 2009

Construction began June 1 and was complete July 23, 2009.



This preservation project paved 9.96 miles, which began at MP 89.14 (near the Tumwater Campground) and ended at the west city limit of the town of Leavenworth.

Why is WSDOT paving US 2?
The project upgrades the structural integrity and extends the life of the existing pavement, improving the ride as well as providing drainage and safety improvements.

The End Result
The project preserves the roadway, improves safety and reduces maintenance costs.

Project Benefits

  • Extends roadway life
  • Provides a smoother driving surface
  • Upgraded deficient safety items

What is the project timeline?
Construction began June 1 and was complete July 23, 2009.

Financial Information
This project was advertised for private contractor bids on March 16, 2009. Two qualified bids were opened on April 16th. On April 20th, contract #7716 was awarded to Central Washington Asphalt, Inc. for $1,683,781.53, 23% below the engineering estimate.

  • Pre-existing gas tax - $2.68 million
  • Total Funding from all sources - $2.68 million

How can I get more information?
Contact:
Kevin Waligorski Project Engineer
WSDOT North Central Region
2830 Euclid Ave
Wenatchee, WA 98807
Phone: (509) 667-2860 or toll free (888) 461-8816
E-mail: waligok@wsdot.wa.gov