Skip Top Navigation

US 2 - Espanola Road to I-90

Status

October 2014

  • Weekly Construction Update
  • Awarded to Inland Asphalt Company of Spokane with a construction bid of $5,108,782.
  • Complete early October 2014.

 

US 2 will be resurfaced with hot mix asphalt.  Also, a signal system will be installed at the Flint Road intersection.

Why is WSDOT Resurfacing this highway?
This project preserves the roadway by milling (grinding down) and repaving US 2.

The End Result
Upgrades the structural integrity and extends the life of the roadway.

Project Benefits
Paving upgrades the structural integrity and extends the roadway life. The signal will provide control over traffic flow at this connection to the Spokane Airport.

What is the project timeline?
Work on the project was completed October 2014.

Financial Information

Financial Data for PIN 600227L, 600227U
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $5,303
Total $5,303

Project signage will reflect the cost of construction engineering, project bid award and sales tax.

How can I get more information?
Contact:
Bob Hilmes, Project Engineer
2714 N. Mayfair
Spokane, WA  99207
509-324-6232
hilmesb@wsdot.wa.gov

back to top