US 2 - Espanola Road to I-90 - Complete November 2014

Overview
US 2 was resurfaced with hot mix asphalt. Also, a signal system was installed at the Flint Road intersection.

How You Benefit
Cross GlyphImproves Safety
The signal provides control over traffic flow at this connection to the Spokane Airport.
Dollar Sign Glyph Economic Incentive
Paving upgrades the structural integrity and extends the roadway life preserving the public's investment in the highway system.

Partnerships & Cooperation
WSDOT partnered with the city of Spokane on the flint Road traffic signal.

Funding

2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $5,303
Total $5,303