Project Title & Location
US 2/Dryden-Signal - Dryden
|
Project Description
Install traffic signal system to reduce traffic conflicts and accidents.
|
|
Contractor/Consultant
This project was awarded to Central Washington Asphalt, Inc. of Moses Lake.
|
|
Recent Progress
The project was advertised for bids with the US2/Leavenworth to Cashmere-Paving project on October 16, 2006 and awarded to Central Washington Asphalt on November 17, 2006.
|
|
Design Construction Impacts
The Dryden community has been requesting this signal for a number of years. This signal was also identified as part of the Corridor Safety Study conducted on US 2/97 between Peshastin and Wenatchee in June of 2002. There have been several meetings in the past with the community concerning the signal. As part of this project an on-connection ramp from a frontage road will be closed.
|
|
Environmental Impacts / Compliance
NEPA and SEPA documentation were completed in May 2005. Under NEPA guidelines, the project is categorized as a Documented CE (Categorical Exclusion) and Categorically Exempt under SEPA guidelines.
|
Impacts to Traffic
Occasional lane closures can be anticipated during construction. Also, modifications will occur to the existing paint striping.
|