US 2/97 - Peshastin East Interchange - Complete November 2008

Quarterly Project Report Update for Quarter Ending June 2008

Project Title & Location
US 2/97 Peshastin East-Interchange - Peshastin

Project Description
Construct a new interchange at the junction of US 2 and US 97. This intersection is located 15 miles West of Wenatchee and 5 miles East of Leavenworth.

Contractor/Consultant
KLB Construction Inc.

Recent Progress

A groundbreaking ceremony was held on April 3rd and the contractor started construction on April 7th.  US 2 traffci was shifted to the temporary detour on May 8th and bridge construction began soon after.

Design Construction Impacts
Blewett Junction Road and Doghouse Road are permanently closed at the intersection with US 2.

Environmental Impacts / Compliance
A Determination of Non-Significance (DNS) has been issued under the State Environmental Policy Act (SEPA).  A Notice of Action was issued on October 21, 2006.  No responses were received.

Impacts to Traffic
A temporay signal at the US 2/97 intersection has been activated and traffic is rerouted onto the bypass roadway on the north side of US 2.intersection.  A 35 MPH reduced speed limit is in effect through the work zone.  This project is one of four chose for a photo speed enforcement test this year.

Project Milestones Scheduled Attained Milestone Outlook
Contract Advertised September 24, 2007 September 24, 2007 Complete
Contract Awarded October 22, 2007 November 17, 2007 Complete
Groundbreaking April 7, 2008 April 3, 2008 Complete
Open to Traffic October 30, 2009 No Issues at this time.
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering $1.48 m 7%
Right-of-Way $6.1 m 28%
Construction $14.36 m 65%
Funded Project Costs $21.94 m 100 %

Nickel funds included in above costs

$21.87 m 100 %

2005 Transportation Partnership Account

  For more information, go to www.wsdot.wa.gov/projects

Eric Pierson, WSDOT Project Engineer @ (509) 667-2870 Or E-mail: Piersoe@wsdot.wa.gov