US 195 - SR 271 Junction to Plaza - Complete March 2007

Project Status - Complete
US 195 Rosalia to Plaza Small

Overview
The current road surface was deteriorating in this eight-mile section. Repaving preserves the existing pavement structure and extends pavement service life. The end result is a safer highway, a smoother driving surface and extended roadway life. This was achieved by overlaying the existing pavement with about 2 inches inches of Hot Mix Asphalt (HMA).

How You Benefit
Dollar Sign Glyph Economic Incentive
Preserves the roadway foundation by repaving the driving surface.  Also provides a smoother ride for motorists.

Partnerships & Cooperation
Funding for the work came through a partnership with the Federal Highway administration.

Funding

This project was funded through the following sources:

State & Federal Funds - Construction bid $1,732,000