US 12 - Chapman Rd Vic to Coal Creek Bridge – Chip Seal

Status

Nov. 2017

 

In the summer of 2016, contractor crews working for the Washington State Department of Transportation will resurface 16 miles of US 12 between Randle and the entrance to the Gifford Pinchot National Forest in Lewis County.

This project will be completed in two seasons. Pavement repairs will begin in August, 2016, and crews will return to chip seal the road in the summer of 2017.

Why is WSDOT resurfacing US 12 in east Lewis County?
With US 12 showing signs of deterioration, like cracking, potholes and rutting, the asphalt is nearing the end of its useful life. This work is needed to preserve the road for the next several years, and prevent more costly repairs.

The End Result
In addition to providing drivers a smoother ride, the work helps WSDOT preserve US 12 in east Lewis County.

Project Benefits

  • Preserves infrastructure and extends the life of the highway.
  • Reduces the need for costly emergency maintenance repairs and unexpected closures.

What is the project timeline?

  • April 2016: Project advertised for competitive bidding
  • May 2016: Project awarded for construction
  • August 2016: Construction begins
  • Summer 2017: Construction will be completed

Financial Information

Financial Data for PIN 401215B
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $2,196
CWA $0
Total $2,196

The project cost is part of a larger construction contract for resurfacing US 12 in Lewis County.

How can I get more information?
Contact:
Colin Newell 
WSDOT Project Engineer
360-740-8600, or toll-free 1-866-713-2412
swChehalis@wsdot.wa.gov


Bart Treece
WSDOT Communications
360-905-2058
Treeceb@wsdot.wa.gov

back to top