2006 - 2007 Construction

6 miles east of summit - This portion of the project removes debris and constructs rock fall containment areas.

5 miles west of summit- Work in this section includes loose rock, timber, and debris removal. Rock anchor bolts will be drilled into the rock face to stabilize the slope. Wire mesh will be put up to keep rocks from falling onto the roadway.

15 miles east of summit - Work will consist of loose rock removal, wire mesh slope protection, slope drains, hazard timber removal, controlled blasting, and debris removal.