WSDOT Projects

text size: T T T

US 12/SR 124 Intersection - Build Interchange - Open House

Summary

WSDOT design, real estate, and environmental experts hosted over 140 Burbank area residents for an open house displaying the latest design concepts for a US 12/SR 124 interchange. Many comments centered on access to US 12 and local road impacts.

Our next step will be to review and address the comments received, and make necessary adjustments to our design. There are no new public meetings planned at this time.


  
Displays and Folios

US 12 / SR 124 Burbank Interchange Improvements
    Welcome - display (pdf 444 kb)
    Preferred alternative - display (pdf 504 kb)    
    Project timeline - display (pdf 649 kb)
    Design concept - display (pdf 261 kb)
    Humorist Road concepts - display (319 kb)
    Burbank roundabout - display (pdf 150 kb)
    Project folio (pdf 1 mb)

US 12 - Corridor
    Four-laning US 12 phases - display (pdf 1 mb)
    Project folio (pdf 937 kb)

US 12 - Attalia Vicinity (Phase 3)
    Aerial photo - display (pdf 174 kb)
    Timeline - display (pdf 248 kb)
    Project folio (pdf 1 mb) 

US 12 - Frenchtown Vicinity to Walla Walla (Phase 6)
    Aerial photo - display (pdf 452 kb)
    Project folio (pdf 1 mb)

Note: These files are in PDF format; you must have a free copy of Adobe Reader installed on your computer to correctly view them. The PDF documents on this page are web viewing quality only.

Photos

Overview of the event
Overview of the event

WSDOT engineers answer questions for the public
WSDOT engineers work with the public to provide project information and answer questions

WSDOT engineer explains the project to attendees
A WSDOT engineer uses a project folio to provide interested citizens with additional project information

WSDOT engineers answer questions from the public
A WSDOT engineer uses a project display to explain project details and answer questions

Opportunity to fill out an exit survey about the event
Comment cards provided an opportunity for the public to ask questions, leave comments, provide any additional feedback, and sign up for a mailing list to receive additional US 12 project information