US 12 - Wallula to Walla Walla Corridor Study

Quarterly Project Report Update for Quarter Ending September 2004

Project Title & Location
US 12 – Phase 4, Walla Walla to Wallula Planning Study, Walla Walla County

Project Description
This planning study will prepare initial environmental documentation to determine the preferred corridor alignment for US 12 from the Wallula junction to Walla Walla, addressing congestion and safety needs for the highway.

Contractor/Consultant
Transpo Group - Traffic Study;  David Evans and Associates - Environmental Documentation; Economic and Engineering Services, Inc. - Watershed Mitigation Implementation

Recent Progress

The Design Team began preparations for the Phase 6 access hearing and began preparing right of way plans.  The Design team talked with the City of College Place, City of Walla Walla, and Walla Walla County about intersection location and design for the proposed Phase 6 corridor.  The second IPT meeting was held on September 27th and 28th in Walla Walla.  Topics included discussions of preliminary resource impacts, the status of each phase of the planning study, and the TPEAC watershed subcomittee pilot project.

Design Construction Impacts

Environmental Impacts / Compliance
David Evans and Associates completed the preliminary  Environmental Resource Studies in September.  The Planning Study was designated as a TPEAC Watershed Subcommittee pilot project.  Economic and Engineering Services, Inc. was hired to coordinate the implementation of TPEAC watershed process into this project. 

Impacts to Traffic

 

Project Milestones Scheduled Attained Milestone Outlook
Start Scoping Oct 03 Sep 03 Scoping started one month early.
Start IPT Jan 04  Jan 04  
Finish  Scoping Oct 05    
   

 

     
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering $ 7.2 100 %
Right-of-Way
Construction
Funded Project Costs $ 7.2 100 %

Nickel funds included in above costs

$ 3.0 42 %

2005 Transportation Partnership Account

  For more information, go to www.wsdot.wa.gov/projects

Kerry Grant, WSDOT Project Engineer @ (509) 577-1760 or E-Mail grantk@wsdot.wa.gov