Project Title & Location
US 12 – Phase 4, Walla Walla to Wallula Planning Study, Walla Walla County

Project Description
This planning study will prepare initial environmental documentation to determine the preferred corridor alignment for US 12 from the Wallula junction to Walla Walla, addressing congestion and safety needs for the highway.

Contractor/Consultant
David Evans and Associates conducted the Preliminary Environmental Investigation. 

Recent Progress
WSDOT conducted a Level 1 analysis of all of the preliminary environmental and engineering data for the south, middle, and north corridor alternatives.  With Federal Highways Administration (FHWA) concurrence, WSDOT has eliminated the middle and south (existing) corridors from further consideration.  

To conclude the study, WSDOT will now complete the environmental documentation to better define the northern corridor alternative and identify any environmental impacts that need to be mitigated.  This level of analysis will likely require an Environmental Assessment.

Funding to complete the environmental documentation and early design work on this project was included in the 2007-2009 Governor's Transportation Budget.

Design Construction Impacts

Environmental Impacts / Compliance

Impacts to Traffic

Project Milestones Scheduled Attained Milestone Outlook
Start Scoping Oct 03 Sep 03 Scoping started one month early.
Start IPT Jan 04  Jan 04 Team started on schedule.
Finish Level 1 Analysis Aug 06  Sept 06  
Environmental Document July 09 The level 1 analysis determined that an EA is the likely form of environmental documentation. 
     
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering $4.4 100 %
Right-of-Way
Construction
Funded Project Costs $4.4 100 %

Nickel funds included in above costs

$1.6 36 %

2005 Transportation Partnership Account

  For more information, go to www.wsdot.wa.gov/projects

Kerry Grant, WSDOT Project Engineer
(509) 577-1760 or grantk@wsdot.wa.gov