US 12 - Old Naches Highway - Build Interchange

Quarterly Project Report Update for Quarter Ending June 2006

Project Title & Location
US 12 - Old Naches Highway Interchange

Project Description
This project will construct a new interchange at the intersection of US 12 and the Old Naches Highway. A new interchange will remove the existing traffic signal, improve route capacity, and reduce collisions; thus improving the overall safety of the highway.

Contractor/Consultant
Project has not been advertised or awarded.

Recent Progress

Early design work has started.  Interchange alternatives are being studied.

Design Construction Impacts
None anticipated at this time.

Environmental Impacts / Compliance
Flood plain and minor wetland impacts anticipated.

Impacts to Traffic
One lane closures and detours anticipated.

Project Milestones Scheduled Attained Milestone Outlook
PE Phase Start Jan 2000 Jan 2000 Attained.
Environmental Document Complete June 2009 No impacts anticipated at this time.
Right of Way Certified June 2013 No impacts anticipated at this time.
Contract Advertisement Date July 2013 No impacts anticipated at this time.
Operationally Complete June 2013 No impacts anticipated at this time.
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering $ 1.6  4.5 %
Right-of-Way $ 2.5  7.0 %
Construction $ 31.7 88.5 %
Funded Project Costs $ 35.8 100 %

Nickel funds included in above costs

$ 34.8 97.2 %

2005 Transportation Partnership Account

- -

  For more information, go to www.wsdot.wa.gov/projects

Troy Suing, WSDOT Project Engineer
(509) 577-1703 or suingt@wsdot.wa.gov