Skip Top Navigation

US 101 D St Vicinity to Water Street Paving and ADA

Status

January 2018

Why is WSDOT Repaving US 101 through South Bend and adding curb ramps to the sidewalks?
The pavement on US 101 between D Street and Water Street is showing signs of wear and tear. The road needs repaving to prevent additional damage and more costly repairs in the future. Sidewalk curb ramps will be improved to help people of all abilities as the travel along this stretch.

The End Result

Paving the road extends the life of the pavement and reduces the need for expensive and unplanned repairs.

New curb ramps will provide safe street crossings for people of all abilities.

Project Benefits

Preservation – Keeps the road in good working condition for several years.

Improves sidewalk crossings – Easier for people using the sidewalk to cross the street.

What is the project timeline?

  • Advertise project for competitive bid – Feb. 26, 2018
  • Construction scheduled to begin – Summer 2018
  • Construction scheduled for completion – Fall 2018

Financial Information

Financial data is manually updated.

How can I get more information?
Contact:
Contact:
Colin Newell
WSDOT Project Engineer
360-740-8600
swChehalis@wsdot.wa.gov

or

Bart Treece
WSDOT Communications
360-905-2058
Treeceb@wsdot.wa.gov

back to top