US 101 - SR 3 On-Ramp to US 101 Northbound

Project Facts
  • The existing at-grade intersection requires SR 3 traffic headed northbound on US 101 to make a left turn across southbound US 101 traffic.
  • This project constructs a new northbound on-ramp from SR 3 to US 101.
  • The new northbound on-ramp is part of the ultimate SR 3/US 101 interchange. The existing interchange will be completed when the future southbound lanes of US 101 are constructed.

Project Status

October 2008    

Read this week's construction activity and traffic impacts report.

Construction is on schedule to be complete by the end of this month. Tri-State Construction, Inc. of Bellevue is the contractor.

Motorists can expect daytime shoulder closures to continue throughout the project's duration.

The contractor is currently striping the roadway and installing landscape plantings and signs. 

Construction of new US 101 on-ramp from SR 3 begins

Why is WSDOT building a ramp from SR 3 to northbound US 101?
In 1972 a planned interchange at the intersection of SR 3 and US 101 was partially constructed. At that time, southbound SR 3 traffic accessing northbound US 101 was quite low. Traffic making these movements was accommodated with a temporary at-grade intersection.

Since 1972, increases in traffic volume have increased the risk of collisions at this location. Construction of the northbound on-ramp for the planned interchange will provide a safer, more efficient access point for SR 3 traffic going northbound on US 101.

The End Result
Construction of the new northbound ramp eliminates left turns at the existing at-grade intersection. Construction of the northbound on-ramp will complete a portion of the planned SR 3/US 101 interchange.

Project Benefits

  • Safety. The new northbound on-ramp eliminates left turns from SR 3 to northbound US 101, increasing motorist safety.

What is the project timeline?
Construction is now under way. The project is on schedule to be complete in October 2008.

Public Involvement
Your thoughts and opinions are important to us. Please contact the project construction office for further information, 360-412-3420.

Environmental Protection
WSDOT completed appropriate environmental documentation for the project to identify and address potential environmental issues.

WSDOT is committed to protecting the environment, and makes every effort to assess and minimize negative impacts from highway improvement projects.

Please visit the WSDOT Environmental Services Web site for more information.

Increasing safety is one of our priorities
We are working to improve transportation safety across the state. Learn more about WSDOT's commitment to safety.

Will this project impact tribal resources?
This project will not impact tribal resources because it is not located within tribal lands. However, the process outlined in Section 106 of The National Historic Preservation Act and the WSDOT Tribal Consultation Policy adopted in 2003 by the Transportation Commission is applicable.

Financial Information

This project is funded through the following sources:

 

How can I get more information?
Contact:
MaryLou Nebergall, Project Engineer
WSDOT Lacey Project Office
7912 Martin Way, Suite E
PO Box 47448
Lacey, WA 98516-5703
Phone: 360-412-3420

back to top