WSDOT Projects

text size: T T T

SR 99 North Corridor Study - Route Development Plan

The final recommendations proposed by the state are published in the SR 99 North Route Development Plan, linked below as downloadable files for viewing or printing. The report is also available by mail for $15.00. To order hard copies, contact the project manager listed below.

The RDP was divided into sections to reduce the file sizes and make it easier to download. All files linked below are Adobe pdf files.

Front Cover and Signature Page pdf 304Kb
Introduction pdf 417Kb
Table of Contents pdf 134Kb
Chapter 1a - Existing Conditions (two parts) pdf 457Kb
Chapter 1b pdf 186Kb
Chapter 2 - Traffic Conditions pdf 219Kb
Chapter 3 - Accidents and Safety Issues pdf 329Kb
Chapter 4 - Design Standards pdf 182Kb
Chapter 5 - Near-term Improvements pdf 152Kb
Chapter 6a - Long-term Improvements (two parts) pdf 1.4Mb
Chapter 6b pdf 1.3Mb
Chapter 7 - Public Outreach pdf 171Kb
Chapter 8 - Consistency with Other Plans pdf 184 Kb
Chapter 9 - Environmental Inventory pdf 694Kb
Chapter 10 - Funding and Implementation Plan pdf 99Kb
Appendices A - E pdf 285Kb
Appendix F pdf 174Kb
Appendix G pdf 217Kb