SR 99 - Roy St to N 145th St - Paving & ADA Compliance

Project Phase
A small map of the paving project on 7.58 miles of SR 99/Aurora Avenue North from Roy Street to North 145th Street in Seattle. View larger project map

A small photo of SR 99/Aurora Avenue North at North 39th Street in Seattle. Northbound SR 99/Aurora Avenue North approaching North 39th Street in Seattle.

View more photos

Status

October 2017

  • This project is scheduled to be advertised for competitive bidding in February 2018.
  • Construction is scheduled to begin in spring 2018.
  • Sign up to receive email updates about this project and other Seattle-area topics.

Overview
Contractor crews will grind and repave 7.58 miles of State Route 99/Aurora Avenue North from Roy Street to North 145th Street in Seattle. In addition, dozens of pedestrian ramps will be rebuilt or added to provide a smoother transition between the sidewalks and crosswalks.

The George Washington Memorial (Aurora) Bridge will be resurfaced as part of a separate bridge painting project.

Why is WSDOT paving SR 99 between Roy Street and North 145th Street?
The pavement on this stretch of SR 99 is showing its age with ruts and cracks, which can lead to potholes. Asphalt is generally only intended to last 15 years. This area was last paved in 1999. Sections of asphalt have been repaired, but the surface continues to deteriorate. Up to 40,000 vehicles use this major route through north Seattle daily.

What should drivers expect?
While most of the work can be completed through nighttime lane and cross street closures, some daytime lane closures are needed for pedestrian ramp work.

The End Result
This project will provide drivers with a smoother, safer ride on SR 99. New pavement will preserve the life of the roadway and reduce maintenance needs. Reconstructed and new curb ramps will improve pedestrian access along SR 99 and overall pedestrian connectivity.

Project Benefits

  • Safety: Improving the highway surface eliminates and helps prevent future potholes, cracks and wheel ruts where water can collect. This gives drivers a safer, smoother ride. Reconstructed and new ADA-compliant pedestrian ramps create an easier transition between street and sidewalk.
  • Economic: Paving reduces the need for emergency pavement repairs, which are costly to taxpayers and can cause additional congestion during peak commute hours.

What is the project timeline?

  • February 2018: Project is scheduled to be advertised for competitive bidding.
  • Spring 2018: Construction is scheduled to begin.
  • Fall 2018: Construction is scheduled to be complete.

Financial Information

Financial Data for PIN 109945A, 109945B, 109948A, 109948B
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $15,416
CWA $0
Total $15,416

How can I get more information?
Contact:
Tom Pearce  
Communications
206-440-4696