Skip Top Navigation

SR 7 - Alder Canyon Emergency Slope Stabilization - Project Map


The above detour is no longer necessary. The roadway was re-opened in October 2012 after temporary repairs were made. In July 2013, WSDOT was able to stabilized a five-mile segment of hillside above SR 7, reducing the potential for slide related closures.