Project Title & Location
SR 6 - South Fork Chehalis River Bridge Replacement
|
Project Description
The existing bridge is rated as structurally deficient and in need of replacement. It is too narrow for passing trucks to travel on the bridge at the same time.
|
|
Contractor/Consultant
|
|
Recent Progress
Bids will be opened during the first part of June with construction scheduled to start in midsummer 2008.
|
|
Design Construction Impacts
The new bridge will be constructed north of the existing bridge to reduce traffic impacts. Staging plans will eliminate the need for signalized one-way traffic during construction.
|
|
Environmental Impacts / Compliance
Environmental permits are completed.
|
Impacts to Traffic
During construction, there will be single lane closures with flaggers.
|