The old bridge comes down. April 30, 2005




From the stage 1 west abutment looking west. Showing the area yet needing to be filled with gravel for the approach.

Looking east across the newly poured concrete bridge deck, which is covered with wet burlap and visaquene to aid in curing the concrete.

Concrete bridge deck placing machine (photo taken March 3)

This is the concrete pump truck (photo taken March 3)

Placing the bridge deck concrete (photo taken March 3)

Preparation for the placement of the bridge deck concrete (photo taken March 2)

This photo was taken February 28 from pier 1 looking north.

January 31, 2005: The new bridge deck is being formed.

January 31, 2005: Crews build a support structure for the new bridge.