WSDOT will repave State Route 531 from milepost 7.24 to milepost 9.58 (from
roughly 43rd Ave. to SR 9). We will grind and make pavement repairs where
needed first, and after repaving, replace pavement marking and traffic loops.
Crews will also bring sidewalk and curb ramps at 67th Ave. up to
ADA standards.