Skip Top Navigation

SR 525 - SB Alderwood Mall Pkwy - Intersection Improvements - Photos

A large photo looking north at Alderwood Mall Parkway at the southbound SR 525 off- and on-ramps. A signal will be installed here, along with a crosswalk across Alderwood Mall Parkway on the north side of the intersection.
Looking north at Alderwood Mall Parkway at the southbound State Route 525 off- and on-ramps, where a signal will be installed.

A large photo of the southbound SR 525 off-ramp to Alderwood Mall Parkway will be restriped to increase line of sight, reduce collisions and improve traffic flow. A crosswalk will also be installed across the ramp at the intersection.
The southbound SR 525 off-ramp to Alderwood Mall Parkway will be restriped to increase line of sight, reduce collisions and improve traffic flow.

A large photo of two curb ramps on the Alderwood Mall Parkway on-ramp to southbound SR 525 that will be reconstructed to meet current Americans with Disabilities Act guidelines. A crosswalk will also be installed across the ramp at the intersection.
Two pedestrian ramps on the Alderwood Mall Parkway on-ramp to southbound SR 525 will be reconstructed to meet current Americans with Disabilities Act guidelines. A crosswalk will also be installed across the ramp at the intersection.