WSDOT Projects

text size: T T T

SR 520 Bridge and HOV Project - Library - Technical Documents

Technical Documents

This page contains studies, reports SR 520-related legislation and findings. The documents are listed in chronological order and categorized by topic.

 

Conceptual plans and costs-by-segment

House Bill 2878 - 2008 Supplemental Transportation Budget

  • House Bill 2878 as passed by legislature and signed by Gov. Gregoire (external site) - March 2008 (pdf 320 kb)

House Bill 1773 - Establishing State Tolling Authority and Statewide Guidelines for Tolls 

  • House Bill 1773 as passed by legislature and signed by Gov. Gregoire (external site) - March 2008 (pdf 80 kb)

House Bill 3096 - Financing the SR 520 Bridge Replacement and HOV Project

  • House Bill 3096 as passed by legislature and signed by Gov. Gregoire (external site) - March 2008 (pdf 20 kb)

Early Pontoon Construction Project Draft Purpose and Need Statement

SR 520 Finance Plan

SR 520 Draft High Capacity Transit Plan

Toll Feasibility Study

ESSB 6099 as passed by the 2007 Legislature

Washington Office of State Treasurer’s Report on SR 520 Bridge Replacement and HOV Project Funding Alternatives

Governor Chris Gregoire's Findings on the Project

 
August 11, 2006— Draft Environmental Impact Statement
  • Cover and Table of Contents (pdf 427 kb)
  • Chapter 1 - Introduction to the project (pdf 1.1 mb)
  • Chapter 2 - Project Area: Then and Now (pdf 3.5 mb)
  • Chapter 3 - Developing the Alternatives (pdf 5.4 mb)
  • Chapter 4 - Comparison of the Alternatives (pdf 2.3 mb)
  • Chapter 5 - Detailed Comparison of Alternatives: Seattle (pdf 3.8 mb)
  • Chapter 6 - Detailed Comparison of Alternatives: Lake Washington (pdf 556 kb)
  • Chapter 7 - Detailed Comparison of Alternatives: Eastside (pdf 2.9 mb)
  • Chapter 8 - Construction Effects (pdf 1.6 mb)
  • Chapter 9 - Other Considerations and Index (pdf 717 kb)
Appendices and Addenda
     A

    

Description of Alternatives and Construction Techniques
Appendix (pdf 1 mb) Addendum(467kb)
B Agency Coordination and Public Involvement (pdf 629 kb)
C Air Quality Discipline Report
Appendix (pdf 1.1 mb) Addendum (pdf 722 kb)
D Cultural Resources Discipline Report
Appendix (in four parts): Part 1 (pdf 5.1 mb) Part 2 (pdf 5.5 mb)
Part 3 (pdf 5.8 mb) Part 4 (pdf 5.3 mb)
Addendum (in four parts) - Part 1 (pdf 5.4 mb) Part 2 (pdf 5.2 mb)
Part 3
(pdf 5.3 mb) Part 4 (pdf 5.2 mb)
E Ecosystems Report
Appendix (in three parts):
Part 1 (pdf 3.8 mb) Part 2 (pdf 5.2 mb) Part 3 (pdf 4.7 mb)
Addendum (in two parts): Part 1 (pdf 6.2 mb) Part 2 (pdf 6.8 mb)
F Energy Discipline Report
Appendix (pdf 322 kb) Addendum (pdf 800kb)
G Environmental Justice Analysis
Appendix (pdf 1.1 mb) Addendum (pdf 1.1 mb)
H Geology and Soils Discipline Report
Appendix (in two parts): Part 1 (pdf 5.2 mb) Part 2 (pdf 5.4 mb)
Addendum (pdf 4.1 mb)
I Hazardous Materials Discipline Report
Appendix (pdf 1.3 mb) Addendum (pdf 2 mb)
J Indirect and Cumulative Effects Discipline Report
Appendix (in three parts):
Part 1 (pdf 6.1 kb) Part 2 (5.4 mb) Part 3 (pdf 4.7 mb)
Addendum (pdf 4.7 mb)
K Land Use, Relocations and Economics Discipline Report
Appendix (pdf 5.6 mb)
Addendum (in two parts): Part 1 (pdf 4.6 mb) Part 2 (pdf 4.2 mb)
L Navigable Waterways Discipline Report
Appendix (pdf 2.7 mb) Addendum (pdf 766 kb)
M Noise Discipline Report (in three parts):
Part 1 (pdf 5.7 mb) Part 2 (pdf 6.1 mb) Part 3 (pdf 5.4 mb)
Addendum (pdf 3.9 mb)
N Public Services and Utilities Discipline Report
Appendix (pdf 783 kb) Addendum (pdf 1.1 mb)
O Recreation Discipline Report
Appendix (in two parts): Part 1 (pdf 5.5 mb) Part 2 (pdf 4.8 mb)
Addendum (in four parts): Part 1 (pdf 5.8 mb) Part 2 (6.1 mb)
Part 3 (4.7 mb) Part 4 (5.9 mb)
P Draft Section 4(f) Evaluation
Appendix (in four parts): Part 1 (pdf 5 mb) Part 2 (pdf 4.7 mb)
Part 3 (pdf 5.4 mb) Part 4 (pdf 2.7 mb)
Addendum (in four parts): Part 1 (pdf 4 mb) Part 2 (pdf 5.6 mb)
Part 3 (pdf 4.7 mb) Part 4 (pdf 6 mb)
Q Social Discipline Report
Appendix (pdf 6.9 mb) Addendum (pdf 1.2 mb)
R Transportation Discipline Report
Appendix (in six parts):
Part 1 (pdf 5.1 mb) Part 2 (pdf 5.4 mb) Part 3 (pdf 5.2 mb)
Part 4 (pdf 5.6 mb) Part 5 (pdf 6.2 mb) Part 6 (4.6 mb)
Addendum (pdf 6.5 mb)
S Visual Quality and Aesthetics Discipline Report
Appendix (in two parts): Part 1 (pdf 5 mb) Part 2 (pdf 4.4 mb)
Addendum (pdf 950 kb)
T Water Resources Discipline Report
Appendix (pdf 6.1 mb) Addendum (pdf 1.7 mb)
U 8-Lane Alternative Report (in two parts):
Part 1 (pdf 4.4 mb) Part 2 (pdf 4.4 mb)
V 6-Lane Alternative Options Report (in two parts):
Part 1 (pdf 5.2 mb) Part 2 (pdf 5.7 mb)
W Madison Park Bicycle/Pedestrian Path Options Technical Memorandum (in four parts): Part 1 (pdf 6.3 mb) Part 2 (pdf 5.7 mb) Part 3 (pdf 4 mb) Part 4 (pdf 6.2 mb)
X Pacific Street Interchange Option Location Analysis (pdf 1.3 mb)

Corridor Aesthetics Handbook: Ideas for Urban Corridor Design – August 2006

I-5 to Floating Bridge Tunnel Concept Review

SR 520 Transit Station Usage Study

Cost Estimation Validation Process (CEVP)