SR 520 - Bridge Replacement and HOV Project

Quarterly Project Report Update for Quarter Ending June 2004

Project Title & Location
SR 520 Bridge Replacement and HOV Project

Project Description
The overall project will replace the SR 520 floating bridge and associated approaches. This project is currently funded to complete the environmental review, including an Environmental Impact Statement through the Record of Decision, early right-of-way acquisitions, and design.

Contractor/Consultant
Parametrix of Sumner, Washington is the prime consultant design engineer.

Recent Progress
Nickel funding began July 1, 2003.  Recent project milestones accomplished include: 1) Completion Tolling Feasibility Study; 2) ACTT workshop and draft report; 3) Defined bridge maintenance facility layout;  4) Completed analysis for 8-lane impacts on I-5; 5) Complete 4, 6 and 8 lane EIS level engineering design; 6) Completed Traffic Analysis for all alternatives; 7) Completed Scoping and negotiations for Phase III agreement with consultant to develop new existing right of way plasn and record of survey; 8) Completed appraisal for UW parcel.  Negotiations in progress.  To get cost and descriptions of project options see the project web page.

Design Construction Impacts
A Draft Environmental Impact Statement will be issued in Summer 2005.  A preferred alternative should be identified by Winter 2005.  Funding for further stages of this project depends upon additional funding from the Regional Transportation Investment District (RTID) and tolling.  For estimated project construction costs for the project options under consideration visit the project web page.

Environmental Impacts / Compliance
Environmental assessment and documentation is underway and on schedule.  Work remains within scope and budget.

Impacts to Traffic
Not yet fully determined.

Project Milestones Scheduled Attained Milestone Outlook
Environmental Document Summer 2005   Draft EIS scheduled for Summer 2005.  Final EIS scheduled for Spring 2006.  Record of Decision scheduled for Fall  2007
Right of Way Start, spring 2004   Started Spring 2004 No issues at this time.  Appraisals completed for University of Washington parcel.
Environmental Permits Start, spring 2005   Permitting discussions are in progress now.  No issues at this time.
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering 67.4 91.8%
Right-of-Way 6.0 8.2%
Construction 0.0 0.0%
Funded Project Costs 73.4 100.0%

Nickel funds included in above costs

52.3 71.3%

2005 Transportation Partnership Account

  For more information, go to www.wsdot.wa.gov/projects

Julie Meredith, WSDOT Engineering Manager @ (206) 381-6406 Or E-mail: translake@wsdot.wa.gov