| Environmental reports |
Date |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Final Aquatic Mitigation Report Part 1 (pdf 9.0 mb) Part 2 (pdf 8.9 mb) Part 3 (pdf 14.8 mb) Part 4 (pdf 9.7 mb)
|
December 2011 (Revised February 2012) |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Final Wetland Mitigation Report Part 1 (pdf 4.0 mb) Part 2 (pdf 3.4 mb) Part 3 (pdf 5.9 mb)
|
December 2011 (Revised February 2012) |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Draft Aquatic Mitigation Report (pdf 15.74 mb) |
August 2011 |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Draft Wetland Mitigation Report (pdf 11.43 mb) |
August 2011 |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Geomorphology and Shoreline History of Lake Washington, Union Bay, and Portage Bay Technical Memorandum Part 1 (pdf 7.32 mb) Part 2 (pdf 9.41 mb) |
August 2011 |
|
SR 520, I-5 to Medina Bridge Replacement and HOV Project Record of Decision |
August 2011 |
|
Section 106 Technical Report
Volume 1 of this report contains sensitive cultural resources information that is exempt from public disclosure pursuant to provisions of the Public Records Act (RCW 42.56.300). The Final EIS Cultural Resources Discipline Report contains all information from Volume 1 of the Section 106 Technical Report that is available for the public.
Summary and Introduction (pdf 2.79 mb)
Vol. 2 - Built Environment Chapter 1 - 5 (pdf 5.76 mb) Chapter 6 a (pdf 5.76 mb) Chapter 6 b (pdf 5.51 mb) Chapter 6 c - 9 (pdf 1.88 mb)
Technical Report Vol. 2 - Built Environment Appendices Part 1 Part 1 a (pdf 2.48 mb) Part 1 b (pdf 6.55 mb) Part 1 c (pdf 4.41 mb) Part 1 d (pdf 5.67 mb) Part 1 e (pdf 3.75 mb) Part 1 f (pdf 5.03 mb) Part 1 g (pdf 4.37 mb) Part 1 h (pdf 4.83 mb) Part 1 i (pdf 5.31 mb) Part 1 j (pdf 5.42 mb) Part 1 k (pdf 4.96 mb) Part 1 l (pdf 4.77 mb) Part 1 m (pdf 4.89 mb) Part 1 n (pdf 4.73 mb) Part 1 o (pdf 4.40 mb)
Technical Report Vol. 2 - Built Environment Appendices Part 1 Part 2 a (pdf 5.10 mb) Part 2 b (pdf 5.36 mb) Part 2 c (pdf 5.31 mb) Part 2 d (pdf 5.59 mb) Part 2 e (pdf 5.79 mb) Part 2 f (pdf 5.29 mb) Part 2 g (pdf 5.90 mb) Part 2 h (pdf 5.63 mb) Part 2 i (pdf 5.70 mb) Part 2 j (pdf 5.08 mb) Part 2 k (pdf 6.94 mb) Part 2 l (pdf 5.86 mb)
|
June 2011 |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Final Environmental Impact Statement |
June 2011 |
|
Appendix E - Standards and Guidance Referenced in the SR 520, I-5 to Medina Bridge Replacement and HOV Project–Section 106 Programmatic Agreement
1. Programmatic agreement among FHWA, ACHP, WSDOT, and DAHP implementing the Federal-Aid Highway program in Washington State (pdf 155 kb)
2. Crime prevention through environmental design (pdf 68 kb)
3. Seattle Parks and Recreation Olmsted Park Furniture Standard (pdf 567 kb)
4. DAHP recordation standards for structures (pdf 60 kb)
5. Secretary of the Interior's Standards and Guidelines for the Treatment of Historic Properties (pdf 59 kb)
6. Context-sensitive solutions in transportation planning (pdf 27 kb)
7. Seattle Right of Way Manual - City of Seattle standards about street trees (pdf 72 kb)
8. WSDOT Standards Specifications Manual (pdf 5.08 mb)
9. WSDOT Roadside and Site Development - WSDOT revegetation standards (pdf 20 kb)
10. DAHP guidelines on archaeological data collection (pdf 3.56 mb)
11. WSDOT's Unanticipated Discovery Plan - Plan and Procedures for the Unanticipated Discovery of Cultural Resources and Human Skeletal Remains (pdf 29 kb)
12. City of Seattle requirements concerning noise variances (pdf 111 kb)
13. WSDOT policy and procedures on consultation about noise walls (pdf 228 kb)
14. WSDOT Environmental Procedures Manual (pdf 9.9 mb)
15. WSDOT No idle and fuel conservation policy (pdf 364 kb)
16. WSDOT environmental compliance assurance guidance (pdf 31 kb)
|
April 2011 |
|
SR 520 I-5 to Medina Project Section 6(f) Environmental Evaluation Frequently Asked Questions (pdf 252 kb) |
February 2011 |
|
SR 520 Pontoon Construction Project Record of Decision |
January 2011 |
|
SR 520 Pontoon Construction Project Final Environmental Impact Statement |
December 2010 |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Environmental Evaluation of Section 6(f) Replacement Sites (2.5 mb) |
November 2010 |
|
SR 520 Pontoon Construction Project Draft Environmental Impact Statement Summary of Comments (pdf 3.45 mb) |
July 2010 |
|
AKART and Water Quality Studies for SR 520 Replacement Floating Bridge approval letter (pdf 145 kb) |
June 2010 |
|
SR 520 Pontoon Construction Project Draft Environmental Impact Statement |
May 2010 |
|
SR 520, Medina to SR 202: Eastside Transit and HOV Project Finding of No Significant Impact |
May 2010 |
|
|
|
|
|
|
|
SR 520, SR 202: Eastside Transit and HOV Project Final Wetland Mitigation Report |
April 2010 |
|
SR 520, SR 202: Eastside Transit and HOV Project Final Wetland Mitigation Report Evans Creek Mitigation Site Addendum |
April 2010 |
|
AKART and Water Quality Studies for SR 520 Replacement Floating Bridge (pdf 7 mb) |
April 2010 |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Supplemental Draft Environmental Impact Statement Summary of Comments (pdf 2 mb)
|
April 2010 |
|
SR 520, Medina to SR 202: Eastside Transit and HOV Project Environmental Assessment Summary of Comments (pdf 423 kb) |
February 2010 |
|
SR 520, I-5 to Medina: Bridge Replacement and HOV Project Supplemental Draft Environmental Impact Statement |
January 2010 |
|
SR 520, Medina to SR 202: Eastside Transit and HOV Project Environmental Assessment |
December 2009 |
|
Pontoon Construction Project EIS Scoping Comments Report Addendum (pdf 68 kb)
|
April 2009 |
|
Pontoon Construction Project EIS Scoping Comments Report (pdf 57 kb)
Pontoon Construction Project Public Scoping Meeting
|
March 2009 |
|
Movement and Habitat Use of Chinook Salmon Smolts, Northern Pikeminnow, and Smallmouth Bass Near the SR 520 Bridge (pdf 6.2 mb) |
October 2008 |
|
SR 520 Health Impact Assessment (pdf 2.6 mb) |
October 2008 |
|
Pontoon Construction Project Public Scoping Meeting Comment Summary (pdf 68 kb) |
January 2008 |
|
SR 520 Bridge Replacement and HOV Project Draft EIS Public Comment Report |
December 2006 |
|
SR 520 Bridge Replacement and HOV Project Draft Environmental Impact Statement
|
August 2006 |