Skip Top Navigation

SR 520 Program - Library - Program Videos

Video animations

SR 520 construction videos

Eastside construction
 

  • Time lapse of Eastside girder installation - Jan. 13-16, 2012
    YouTube
  • Girder installation in Medina - Oct. 15-17, 2011
    YouTube
  • Fish culvert installation - July 8-11, 2011
    YouTube | Windows Media Player
  • Pedestrian overpass demolition - June 18, 2011
    YouTube


SR 520 corridor simulations

We have prepared video simulations of the I-5 to Medina: Bridge Replacement and HOV Project and Medina to SR 202: Eastside Transit and HOV Project:

Catastrophic failure animations

These animations simulate what might happen to the SR 520 floating bridge and west approach during a complete and catastrophic failure caused by a severe earthquake or windstorm.