SR 520 - Eastside Environmental Documents

Library > Environmental documents > Eastside

Medina to SR 202: Eastside Transit and HOV Project – Environmental Documents

The Eastside Transit and HOV Project made significant improvements to SR 520's 2.5-mile segment between Lake Washington and I-405, including new HOV lanes, median transit stops, direct-access ramps for buses and carpools, and the first completed portion of a new, regional cross-lake bicycle and pedestrian path. 
 
Below are links to key environmental documents that preceded the construction of these improvements. 

July 13, 2011 — Points Loop Trail relocation

WSDOT relocated a portion of the Points Loop Trail from the north side of SR 520 to the south side between Evergreen Point Road and 84th Avenue Northeast. The change came in response to requests from local jurisdictions and to comply with local and state permit requirements for this project.

May 21, 2010 — Finding of No Significant Impact

Based on a project environmental assessment and public comment, the Federal Highway Administration issued a finding of no significant impact (FONSI) on May 21, 2010.

Updated Environmental Assessment

The following exhibits from the Noise Technical Memorandum were updated in July 2010. The updates were clerical and did not affect the conclusions published in the FONSI.

  • Exhibit 15: Noise modeling locations and levels in Hunts Point north of SR 520 (pdf 998 kb)
  • Exhibit 16: Noise modeling locations and levels in Medina south of SR 520 (pdf 1.2 mb)
  • Exhibit 17: Noise modeling locations and levels in Hunts Point, Clyde Hill, Yarrow Point, and Kirkland north of SR 520 (pdf 2.2 mb)
  • Exhibit 18: Noise modeling locations and levels in Hunts Point, Clyde Hill, Yarrow Point, and Kirkland south of SR 520 (pdf 1.3 mb)
  • Exhibit 35: Noise wall performance summary for Hunts Point, Clyde Hill, Yarrow Point, and Bellevue south of SR 520 (pdf 239 kb)

April 2010 - SR 520, SR 202: Eastside Transit and HOV Project Final Wetland Mitigation Report (pdf 16.0mb)

April 2010 - SR 520, SR 202: Eastside Transit and HOV Project Final Wetland Mitigation Report Evans Creek Mitigation Site Addendum (pdf 4.63mb)

February 2010 - SR 520, Medina to SR 202: Eastside Transit and HOV Project Environmental Assessment Summary of Comments (pdf 423kb)

Dec. 3, 2009 — Environmental Assessment

The Eastside Transit and HOV Project's Environmental Assessment analyzed and compared the environmental effects of two proposed alternatives: the Build Alternative and the No Build Alternative.

Environmental Assessment - Executive Summary (pdf 1.6 mb)

Environmental Assessment - Full Document

Cover and Table of Contents (pdf 1.5 mb)
Chapter 1 - Summary (pdf 831 kb)
Chapter 2 - Need for the Project (pdf 359 kb)
Chapter 3 - Public Outreach and Tribal and Agency Coordination (pdf 634 kb)
Chapter 4 - Description of the Proposed Project (pdf 2.2 mb)
Chapter 5 - Effects of the Project (pdf 173 kb)
- Chapter 5.1 - Cultural Resources (pdf 2.1 mb)
- Chapter 5.2 - Ecosystems (pdf 1.4 kb)
- Chapter 5.3 - Energy (pdf 366 kb)
- Chapter 5.4 - Land Use, Economics and Relocations (pdf 3.1 mb)
- Chapter 5.5 - Noise (pdf 939 kb)
- Chapter 5.6 - Social Elements (pdf 1.7 mb)
- Chapter 5.7 - Transportation (pdf 1.9 mb)
- Chapter 5.8 - Visual Quality (pdf 825 kb)
- Chapter 5.9 - Water Resources (pdf 881 kb)
- Chapter 5.10 - Section 4(f) Resources (pdf 1.3 mb)
- Chapter 5.11 - Indirect and Cumulative Effects (pdf 328 kb)
Chapter 6 - Measures to Avoid, Minimize, or Mitigate Effects (pdf 496 kb)
Chapter 7 - List of Preparers (pdf 378 kb)
Chapter 8 - References (pdf 473 kb)

Appendices and Addenda

A

Glossary (pdf 358 kb)

B

Agency and Tribal Correspondence (pdf 4.7 mb)

C

Draft Programmatic Agreement (pdf 1.5 mb)

D

Regulatory Framework (pdf 947 kb)

E

Agency Coordination and Public Involvement Discipline Report (pdf 1.6 mb)

F

Description of Alternatives and Construction Techniques (pdf 3.0 mb)

G

Air Quality Technical Memorandum (pdf 1.8 mb)

H

Environmental Justice Technical Memorandum (pdf 2.3 mb)

I

Geology and Soils Technical Memorandum (pdf 2.6 mb)

J

Hazardous Materials Technical Memorandum (pdf 2.9 mb)

K

Cultural Resources Technical Memorandum
- Volume 1 (pdf 4.0 mb)
- Volume 1 Attachment 1 (pdf 2.7 mb)
- Volume 1 Attachment 2 (Part 1) (pdf 4.7 mb)
- Volume 1 Attachment 2 (Part 2) (pdf 4.7 mb)
- Volume 1 Attachment 2 (Part 3) (pdf 4.1 mb)
- Volume 1 Attachment 2 (Part 4) (pdf 4.7 mb)
- Volume 1 Attachment 2 (Part 5) (pdf 4.4 mb)
- Volume 1 Attachment 2 (Part 6) (pdf 4.3 mb)
- Volume 2 (pdf 2.0 mb)
- Volume 2 Appendix A (pdf 6.9 mb)
- Volume 2 Appendix B (Part 1) (pdf 4.1 mb)
- Volume 2 Appendix B (Part 2) (pdf 5.1 mb)
- Volume 2 Appendix B (Part 3) (pdf 4.3 mb)
- Volume 2 Appendix B (Part 4) (pdf 4.0 mb)
- Volume 2 Appendix C contains confidential archaeological information and is withheld per RCW 42.56.300
- Volume 2 Appendix D (pdf 1.9 mb)

L

Ecosystems Discipline Report (pdf 4.1 mb)

M

Energy Technical Memorandum (pdf 645 kb)

N

Land Use, Economics, and Relocation Technical Memorandum (pdf 4.6 mb)

O

Noise Technical Memorandum (pdf 9.7 mb)

P

Social Elements Technical Memorandum (pdf 1.5 mb)

Q

Transportation Discipline Report
- Chapters 1-4 (pdf 1.5 mb)
- Chapter 5 (pdf 1.5 mb)
- Chapter 6 (pdf 1.5 mb)
- Chapter 7 (pdf 1.5 mb)
- Chapter 8 (pdf 1.5 mb)
- Chapters 9-10 (pdf 1.5 mb)
- Chapters 11-12 (pdf 1.5 mb)

R

Visual Quality and Aesthetics Technical Memorandum (pdf 2.5 mb)

S

Water Resources Discipline Report (pdf 3.3 mb)

T

Section 4(f) Resources Technical Memorandum (pdf 1.3 mb)

U

Indirect and Cumulative Effects Technical Memorandum (pdf 3.0 mb)