WSDOT awarded the Floating Bridge and Landings Contract to Kiewit/General/Manson, A Joint Venture (KGM)
Contractor quick facts
Contract amount: $586.6 million
Upset price: $750 million
Construction begins on Lake Washington: 2012
New floating bridge open to traffic target: End of 2014
Contact information: Kiewit/General/Manson, A Joint Venture 3015 112th Ave. NE, Suite 100 Bellevue, WA 98004 Phone: 425-576-7100 Fax: 425-576-7159
|
KGM will complete the following work:
- Building a six-lane floating bridge with wider, safer shoulders, a transit/HOV lane in each direction and a bicycle/pedestrian path.
- Towing concrete pontoons to be built in Grays Harbor and assembling the floating bridge on Lake Washington.
- Building 44 supplemental concrete pontoons and 58 anchors.
- Building an east approach connection to the six-lane Eastside highway currently under construction and building a new maintenance facility and dock on the east shore of Lake Washington.
KGM had the best combination of bid price and technical score. By combining design and construction in one contract at a fixed price, the contractor team has more opportunities for innovation while also controlling costs for taxpayers.
KGM combines the experience of three accomplished construction firms. Combined, KGM has a proven track record of safely delivering world-class projects on-time and on-budget, including a number of bridges in the region.
KGM will assemble the workforce and hire vendors and sub-contractors. Visit the SR 520 Contracting and Job Information page for additional information about SR 520 program job and contracting opportunities.
Funding for the project was allocated by the Washington State Legislature using a combination of state and federal funding and future SR 520 toll revenue. Visit the SR 520 Program Costs, Funding and Tolling page for more information.