Pontoon Construction Project environmental documents
|
The Washington State Department of Transportation (WSDOT) has completed environmental analysis for the SR 520 Pontoon Construction Project.
The Federal Highway Administration has signed the Record of Decision, a document that provides concurrence with our plans to build a pontoon construction facility at the Aberdeen Log Yard site and pontoons at that facility.
Now that we have received the Record of Decision, we are able to begin final engineering design and obtain construction permits. We will begin construction as soon as February 2011.
WSDOT is advancing pontoon construction to replace the SR 520 floating bridge over Lake Washington in the event of a catastrophic failure or to store pontoons until they are needed for the proposed SR 520 bridge replacement.
The Record of Decision follows our publication of the Draft Environmental Impact Statement in May 2010 and Final Environmental Impact Statement in December 2010.
Jan. 11, 2011 - Record of Decision
Dec. 2, 2010 - Final Environmental Impact Statement
Executive Summary (pdf 3.5 mb)
Table of Contents (pdf 1.2 mb)
Chapter 1 -
Introduction to the Project (pdf 732 kb)
Chapter 2 -
Project Alternatives (pdf 3.6 mb)
Chapter 3 - Environmental Effects
3.0
Introduction (pdf 732 kb)
3.1 Ecosystems
-
Wetlands (pdf 1.2 mb)
-
Fish (pdf 2.6 mb)
-
Wildlife (pdf 149 kb)
3.2
Geology and Soils (pdf 2.9 mb)
3.3
Hazardous Materials (pdf 597 mb)
3.4
Water Resources (pdf 1.4 mb)
3.5
Air Quality (pdf 282 kb)
3.6
Energy and Climate Change (pdf 228 kb)
3.7
Cultural Resources (pdf 2.2 mb)
3.8
Economics (pdf 61 kb)
3.9
Navigable Waterways (pdf 565 kb)
3.10
Noise (pdf 533 kb)
3.11
Public Services and Utilities (pdf 1.6 mb)
3.12
Land Use (pdf 1.6 mb)
3.13
Social Elements (pdf 2.6 mb)
3.14
Transportation (pdf 647 kb)
3.15
Visual Quality and Aesthetics (pdf 2.5 mb)
3.16
Section 4(f) Resources (pdf 397 kb)
Chapter 4 -
Comparison of the Alternatives (pdf 155 kb)
Chapter 5 -
Mitigation (pdf 658 kb)
Chapter 6 -
Other Considerations and Next Steps (pdf 204kb)
Chapter 7 -
Public and Agency Comments on the Draft EIS (pdf 111 kb)
Attachments 1 -
Preparers 2 -
Distribution List
3 -
References 4 -
Glossary 5 -
Acronyms 6 -
Index 7 -
AppendicesUpdated Appendices
July 2010
SR 520 Pontoon Construction Project Draft Environmental Impact Statement Summary of Comments (pdf 3.45 mb)
May 28, 2010 - Draft Environmental Impact Statement
Executive Summary (pdf 2.7 mb)
Table of Contents (pdf 1.2 mb)
Chapter 1 - Introduction to the Project (pdf 710kb)
Chapter 2 - Project Alternatives (pdf 4.4 mb)
Chapter 3 - Environmental Effects
- Introduction (pdf 1.1 mb)
- Ecosystems (pdf 3.5 mb)
- Geology and Soils (pdf 530 mb)
- Hazardous Materials (pdf 403 mb)
- Water Resources (pdf 1.3 mb)
- Air Quality (pdf 428 kb)
- Energy and Climate Change (pdf 396 kb)
- Cultural Resources (pdf 365 kb)
- Economics (pdf 218 kb)
- Navigable Waterways (pdf 249 kb)
- Noise (pdf 822 kb)
- Public Services and Utilities (pdf 314 kb)
- Land Use (pdf 289 kb)
- Social Elements (pdf 603 kb)
- Transportation (pdf 879 kb)
- Visual Quality and Aesthetics (pdf 2.7 mb)
- Section 4(f) Resources (pdf 215 kb)
Chapter 4 - Comparison of the Alternatives (pdf 152 kb)
Chapter 5 - Preferred Alternative and Next Steps (pdf 156 kb)
Attachments (pdf 626 kb)
Appendices
Note: Updated PDF files for the Cultural Resources Discipline Report and Technical Reports were added on June 8, 2010. These updated files correct a PDF file error found in the previous online and CD versions.
List of public libraries where the EIS is available
Aberdeen Timberland Library
Elma Timberland Library
Hoquiam Timberland Library
Grays Harbor College Library
McCleary Timberland Library
Montesano Timberland Library
Seattle Public Library Central Branch
University of Washington Suzzallo and Allen Libraries
Tacoma Main Library
Westport Timberland Library