Project Title & Location
SR 510 - Yelm Loop
|
Project Description
The purpose of this project is to improve traffic circulation within the City of Yelm by routing the through traffic away from the town center. This project will construct a new 4.2 mile two-lane limited access highway, and includes two roundabouts, one signal, and a separated non-motorized pathway. The new highway will reduce congestion and improve freight mobility, safety, and traffic circulation.
|
|
Environmental Impacts / Compliance
In 1999 and 2000, under the direction of the City of Yelm, a NEPA Environmental Assessment (EA) was completed. FHWA issued a "Finding of No Significant Impact" in 2000. The project team has been re-evaluating the various elements addressed in the original EA.
At the 6/15/06 Pre-BA meeting, the services and FHWA concurred with the strategy to complete the BA for the Y3 (SR 510 Loop) portion only.
|
Impacts to Traffic
The proposed project will be a new corridor. Motorists can expect delays during construction at areas where the new roadway intersects with existing streets.
|