Project Info

SR 410 - SR 167 to 181st St - Paving - Complete September 2016

Overview
This project repaved the surface of State Route 410 and the adjoining ramps from State Routes 167 and 512. This helped reduce potholes and wheel ruts, making for a smoother, safer ride for drivers.

 

How you benefit

Improves safety
Repaving the highway surface helps reduce potholes and wheel ruts making for a smoother, safer ride for drivers.

Economic incentive
Extends the life of SR 410. Repaving reduces the need for emergency repairs, which are costly to taxpayers and can cause unwanted congestion during rush hour.

 

Funding
Pre-Existing Funds (PEF): $1,925,000
Total: $1,925,000

 

Contact us
Brenden Clarke
WSDOT Project Engineer
253-365-6700

Claudia Bingham Baker
WSDOT Communications Manager
360-357-2789