Skip Top Navigation

Project Photos - SR 4 - Emergency Repairs

June 2007 - SR 4 at Milepost 50.9


Slope stabilization and pavement repairs were successfully completed mid-June 2007. 


Slope stabilization and pavement repairs were successfully completed mid-June 2007.


Slope stabilization and pavement repairs were successfully completed mid-June 2007.


Pavement repairs scheduled on State Route 4 after rockfall damaged the highway.

April 2007 - SR 4 at Milepost 50.9


Contractors work to scale loose rock and debris from the slope above State Route 4.


Contractors work to scale loose rock and debris from the slope above State Route 4.


The contractor works to scale loose rock and debris from the slope above State Route 4.


Rock and debris are caught by the fence along State Route 4.