SR 3 - Unstable Slopes South of SR 304 - Complete October 2011

Project Status - Complete







View entire photo set

'Before' picture of the rockface in the Windy Point vicintity between Bremerton and Gorst that WSDOT secured during the project.

Overview

The cliff faces along SR 3 contained loose rocks and boulders with large cracks, causing the potential for rockfall on the highway.

This project removed the loose rocks and other debris from the slopes and used anchor bolts to hold large rocks on the slopes.

Wire mesh slope protection fencing was installed to protect motorists from potential rockfall onto the highway.

The SR 3 project improved safety for the approximately 71,000 drivers who travel through the Windy Point area between Bremerton and Gorst.



 

How You Benefit
Cross GlyphImproves Safety
By removing unstable material and installing rock bolts and protective fencing, WSDOT reduced the potential for future rockslides.
Car GlyphRelieves Congestion
This project improved mobility by vreducing the possibility of emergency closures and traffic delays due to rockslides.

Partnerships & Cooperation

Funding

Financial Data for PIN 300398A, 300398B
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $2,212
Total $2,212

Contact Us