SR 290 - Mission Ave to Sullivan Rd - Paving

Status

March 2017

  • In Design

SR 290, Trent Avenue will be resurfaced from the Mission Ave. "Y" to Sullivan road. In addition, the bridge deck on the Spokane river Bridges near Pines road will be repaired.

Why is WSDOT resurfacing this highway?
High traffic volumes with normal wear and tear has deteriorated the pavement surface and two bridge decks.

The End Result
A smoother roadway and protection for the underlying highway structure.

Project Benefits
A better experience for drivers with a reduced need for repairs and patching.

What is the project timeline?
The project will be designed, advertised for bids and constructed during 2017.

Financial Information

Financial Data for PIN 629000X
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $4,580
CWA $0
Total $4,580

Project signage will reflect the cost of construction engineering, project bid award and sales tax.

How can I get more information?
Contact:
Larry Larson, Project Engineer
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA  99207
509-324-6000