Skip Top Navigation

SR 285 - CO Wenatchee Area - Paving - Complete September 2015

Project Status - Complete
Chelan Avenue Paving Map - Thumbnail
View larger map 
1-3/4 miles of Chelan Avenue wasrepaved. It is a one way, Southbound couplet of SR 285 (Northbound Mission St.) in downtown Wenatchee.


Chelan Ave. @ Palouse - view south - thumbnail View larger image  Chelan Avenue at Palouse St.

Overview

This Roadway Preservation project (P-1) extended the pavement life of the Chelan Avenue-SR 285 Couplet within the City of Wenatchee by replacing the 1-3/4 miles of asphalt driving lanes from North Miller Street to South Mission Street, MP 2.86 to 4.64. The project included crack sealing and fog sealing of areas not being paved, upgrades to signage, striping, sidewalk ramps plus conduit and junction boxes for future expansion of the Intelligent Transportation System (ITS). Pavement needed restoration. Sidewalk ramps didn't meet current American's with Disabilities Act standards. Striping and pavement markings needed replacement. Work began June 15 and was complete Sept. 10. Grinding and paving was done at night to reduce traffic and business impacts. One lane remained open at all times.


How You Benefit
Cross GlyphImproves Safety
Upgrades safety features

Improves access for pedestrians and people with disabilities

Provides a smoother driving surface
Dollar Sign Glyph Economic Incentive
Extends roadway life

Prepares route for future expansion of the ITS.

Partnerships & Cooperation
The work at various locations was scheduled to avoid conflict with activities at businesses, government agencies and health care facilities as a result of a significant public outreach.  WSDOT also provided electronic lobby KIOSKS with daily work and traffic plans in Spanish & English at locations on both ends of the couplet.

Funding

Financial Data for PIN 228500E
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $1,884
CWA $0
Total $1,884
This project was advertised for private contractor bids on Feb. 23, 2015 and on March 25, two qualified bids were opened. On March 30 Central Washington Asphalt Inc. of Moses Lake was awarded contract #8722 for $1,117,117,00, 18% under the engineering estimate.

Contact Us
Kevin Waligorski, Project Engineer
WSDOT North Central Region Project Office
2830 Euclid Avenue Building A
Wenatchee, WA 98801-5916
(509) 667-2860, or toll-free 1-888-461-8816
E-mail: Kevin.Waligorski@wsdot.wa.gov