Skip Top Navigation

SR28 Rock Island Photos

Before
Before the netting was hung.    

After
After the netting was installed.      

View from the top
The view from the top of the slope where the netting is anchored.    

Jennifer Saugen listens to one of those who came to the open house in July
Jennifer Saugen listens at the July Open House in East Wenatchee.   

Brandon Kunz walked the audience through the project plan at the East Wenatchee Open House.
Brandon Kunz explained the work to be done in phase three at the East Wenatchee Open House.   

The red #s show where the Phase 2, Soil Nail Wall, was built in 2004.

What it looked like when work on the soil nail wall was underway 300 feet above Highway 28 in 2004.

It was hard to see the actual work from 310 feet below the construction site on the highway.

Drilling into an unstable slope 310 feet above the highway is not for the faint of heart!