
This is the proposed new configuration for the interchange at the east end of the Senator George Sellar Bridge. Note the new roadway along the Fred Meyer parking lot, near the Columbia River.

This is the current view of the east end of the Senator George Sellar Bridge Interchange.

This aerial photo shows where the new southbound bypass would go.

A formal Design/Access Hearing was held on May 10th, 2005.