Skip Top Navigation

SR 28 East End of George Sellar Bridge Photos

This is the future configuration for the east end of the Senator George Sellar Bridge

This is the proposed new configuration for the interchange at the east end of the Senator George Sellar Bridge.  Note the new roadway along the Fred Meyer parking lot, near the Columbia River.   

Current view of the east end Senator George Sellar Bridge Interchange

This is the current view of the east end of the Senator George Sellar Bridge Interchange.    

Aerial Photo
This aerial photo shows where the new southbound bypass would go.

A formal Design/Access Hearing was held on May 10th, 2005.

A formal Design/Access Hearing was held on May 10th, 2005.